[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: Volume 8, Issue 27 (3-2015) ::
jwmseir 2015, 8(27): 1-10 Back to browse issues page
Performance Evaluation of M5 and MLP models to TDS estimation (A case study: Lighvan Watershed)
Majid Kazemzadeh *
Abstract:   (10057 Views)
TDS parameter is the main factor in water quality assessment and it has many effects on the material
movement, chemical alteration and ionization. Also, TDS density has important role in optimum water
allocation for drinking water, agricultural and industrial uses. However, the aim of this study is TDS
prediction in a case study in Lighvan Watershed using M5 and MLP models. The study area is one of the
sub-basin or watershed in Urmia Lake basin and monthly data collected from two hydrometric stations
during 1972 to 2010. Generally, based on the criteria which evaluate the models, M5 and MLP had the good
performance in the TDS prediction and also mostly they had the same results. In the Lighavn station, among
6 scenarios, the fifth and sixth scenarios showed the highest correlation coefficient between observed and
estimated series based on the inputs combination in two models. Due to these scenarios in the most errors
criteria were closed together, the fifth and sixth scenarios introduced as the best scenarios. In the Hervi
station the results showed that 5th scenario was the best scenario as model inputs. In general, 5th scenario
with HCO-3, Ca2+, Na+, Mg2+ parameters showed the best results for the TDS prediction
Keywords: Total dissolved solid, M5 model, MLP, Prediction, Lighvan watershed
Full-Text [PDF 489 kb]   (1844 Downloads)    
Type of Study: Research | Subject: Special
Received: 2015/06/1 | Accepted: 2015/06/1 | Published: 2015/06/1
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

kazemzadeh M. Performance Evaluation of M5 and MLP models to TDS estimation (A case study: Lighvan Watershed). jwmseir 2015; 8 (27) :1-10
URL: http://jwmsei.ir/article-1-471-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 8, Issue 27 (3-2015) Back to browse issues page
مجله علوم ومهندسی آبخیزداری ایران Iranian Journal of Watershed Management Science and Engineering
به اطلاع کلیه نویسندگان ، محققین و داوران  محترم  می رساند:

با عنایت به تصمیم  هیئت تحریریه مجله علمی پژوهشی علوم و مهندسی آبخیزداری فرمت تهیه مقاله به شکل پیوست در بخش راهنمای نویسندگان تغییر کرده است. در این راستا، از تاریخ ۱۴۰۳/۰۱/۲۱ کلیه مقالات ارسالی فقط در صورتی که طبق راهنمای نگارش جدید تنظیم شده باشد مورد بررسی قرار خواهد گرفت.
Persian site map - English site map - Created in 0.06 seconds with 37 queries by YEKTAWEB 4710