[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
For Authors::
For Reviewers::
Registration::
Contact us::
Site Facilities::
::
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
:: Volume 9, Issue 29 (7-2015) ::
jwmseir 2015, 9(29): 27-34 Back to browse issues page
Detrmining the Flooding Points and Prioritizing Subcatchments of Barajin Catchment of Qazvin Using Hec-HMS and GIS
Mehdi Kamali * , Karim Solaimani , Kaka Shahedi , Amir Noshahri , Afshin Gomrokchi
Abstract:   (10984 Views)
The first step to reduce the flood risk is flood control at the upper parts of watershed. So it is necessary to identify the flood prone regions within watershed, because performing the treatment activities at all over the watershed is impossible due to high expansion of the catchments. In this study, the potential map of flooding was prepared using SCS and overlaying data in GIS. The results showed that the coefficient of flood maintenance is low and the risk of flood occurrence is high due to characteristics of land use and soil hydrological units and the high weighted curve number equal to 78. The flooding potential map indicated that the risk of flood occurrence is really high, especially at the margins of north regions and upper parts of watershed duo to unsuitable land use type, high slope and outcrops without vegetation cover. Therefore, the priority of such regions for watershed engineering operations is more than other parts of watershed. The results of HEC-HMS model has also showed that fifth-sub catchment has the first flood control priority because of the high slope and CN number of 89.
Keywords: Flooding, GIS, CN, Prioritizing, Barajin
Full-Text [PDF 215 kb]   (2005 Downloads)    
Type of Study: Research | Subject: Special
Received: 2015/09/8 | Accepted: 2015/09/8 | Published: 2015/09/8
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

kamali M, Solaimani K, Shahedi K, Noshahri A, Gomrokchi A. Detrmining the Flooding Points and Prioritizing Subcatchments of Barajin Catchment of Qazvin Using Hec-HMS and GIS. jwmseir 2015; 9 (29) :27-34
URL: http://jwmsei.ir/article-1-522-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 9, Issue 29 (7-2015) Back to browse issues page
مجله علوم ومهندسی آبخیزداری ایران Iranian Journal of Watershed Management Science and Engineering
به اطلاع کلیه نویسندگان ، محققین و داوران  محترم  می رساند:

با عنایت به تصمیم  هیئت تحریریه مجله علمی پژوهشی علوم و مهندسی آبخیزداری فرمت تهیه مقاله به شکل پیوست در بخش راهنمای نویسندگان تغییر کرده است. در این راستا، از تاریخ ۱۴۰۳/۰۱/۲۱ کلیه مقالات ارسالی فقط در صورتی که طبق راهنمای نگارش جدید تنظیم شده باشد مورد بررسی قرار خواهد گرفت.
Persian site map - English site map - Created in 0.05 seconds with 37 queries by YEKTAWEB 4710